BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20221209T013000Z
DTEND:20221209T033000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Public Open House: Parks Highway Alternative Corridor PEL Study
DESCRIPTION:SAVE THE DATE: Public Open House No. 2 - Come learn about the current progress\, preliminary alternatives\, and initial screening criteria\n	Schedule - Identify Corridor Alternatives and Develop Screening Criteria:\n\n	The project team is still in the early stages of considering preliminary routes for the Parks Highway Alternative Corridor\, and do not have any routes drawn up at this point. Please note the 2015 Study included on the website is for background information only and no routes are formally approved. The routes shown in that study are being re-evaluated as part of the PEL study process and may not proceed as preliminary alternatives.
X-ALT-DESC;FMTTYPE=text/html:<ul style="box-sizing: border-box\; margin-top: 0px\; margin-bottom: 1rem\; color: rgb(33\, 37\, 41)\; font-family: &quot\;Open Sans&quot\;\, &quot\;Helvetica Neue&quot\;\, Helvetica\, Arial\, sans-serif\; font-size: 16px\;">\n	<li style="box-sizing: border-box\;"><span style="box-sizing: border-box\; font-weight: bolder\;">SAVE THE DATE: Public Open House No. 2</span>&nbsp\;- Come learn about the current progress\, preliminary alternatives\, and initial screening criteria</li>\n	<li style="box-sizing: border-box\;"><span style="box-sizing: border-box\; font-weight: bolder\;">Schedule - Identify Corridor Alternatives and Develop Screening Criteria:</span><br style="box-sizing: border-box\;" />\n	The project team is still in the early stages of considering preliminary routes for the Parks Highway Alternative Corridor\, and do not have any routes drawn up at this point. Please note the 2015 Study included on the website is for background information only and no routes are formally approved. The routes shown in that study are being re-evaluated as part of the PEL study process and may not proceed as preliminary alternatives.</li>\n</ul>\n
LOCATION:Wasilla Public Library\, Multi-Purpose Room\, 500 N Crusey Street\, Wasilla\, AK
UID:e.3185.17742
SEQUENCE:3
DTSTAMP:20260522T195443Z
URL:https://business.wasillachamber.org/events/details/public-open-house-parks-highway-alternative-corridor-pel-study-17742
END:VEVENT

END:VCALENDAR
